Use of the critical path method in works in the Complexo Naval da Ilha do Governador
DOI:
https://doi.org/10.17648/diversitas-journal-v6i1-1340Keywords:
Sanitary sewage, Critical Path MethodAbstract
The basic sanitation of any facility is known to have a direct impact on the quality of life of the people living or working in that space, even contributing to the preservation or degradation of the surrounding environment. Thus, this work aims to apply the critical path method to the sewage works of the Naval Complex of Ilha do Governador. It will be used the PERT / CPM, Critical Path Method, in its execution, with the purpose of monitoring the activities of the repair works. This method is based on Graph Theory and should be used strategically by the manager, as it indicates the set of activities that cannot be delayed, otherwise the project will be delayed. Regarding the methodology, the present research can be classified as exploratory and case study. With the advent of this study, the possibility of returning the functionality of the sanitary sewage network of the mentioned Naval Complex is envisaged, maintaining all the operating characteristics of the original system, recovering the equipment systems of the existing lift and contributing to the reduction of pollution of the waters bordering the facilities. The study is divided into five sections namely: Introduction, Problem Description, Theoretical Rationale, Critical Path Method and Final Considerations. Checking the results obtained with the use of PERT / CPM methods, it was possible to observe the importance of the Critical Path of the activities developed in the work. This research can make a significant contribution to society as the smooth running of the work in question can prevent the dumping of thousands of gallons of fresh sewage into Baía de Guanabara.
Metrics
References
ASSOCIAÇÃO BRASILEIRA DE NORMAS TÉCNICAS. NBR 6880:1997: Condutores de cobre mole para fios e cabos isolados –Características. Rio de Janeiro, 1997.
______________________________________________. NBR 5681: Controle tecnológico de execução de aterros em obras de edificações. Rio de Janeiro, 2015.
______________________________________________. NBR 9575: Impermeabilização –Seleção e projeto. Rio deJaneiro, 2010.
BRUM. M. M; SANAGIOTTO. D. G; MARQUES. M. G, Análise de características hidráulicas e parâmetros geométricos de estações elevatórias de esgoto. XXVIII Congresso Latino-americano de Hidráulica. Anais. Buenos Aires, Argentina. Set/2018.
COSTA, J. D. Aplicação na Construção Civil de Técnicas e Ferramentas de Planejamento e Controle, Baseados no Conceito da Construção Enxuta.Rio de Janeiro: UFRJ, 2016, 68 f. Monografia(Graduação em Engenharia Civil) –Universidade Federal do Rio de Janeiro, Rio de Janeiro, 2016.
MAGALHÃES. R. M; MELLO. L. C. B. B; BANDEIRA. R. A. M, Planejamento e controle de obras civis: estudo de caso múltiplo em construtoras no Rio de Janeiro, Gestão e Produção, vol.25, n.1, pp.44-55. Rio de Janeiro 01/Jun2017.Disponível em: DOI https://doi.org/10.1590/0104-530x2079-15Acesso em: 26 jul. 2020.
MATTOS, A. D.; Planejamento e Controle de Obras, São Paulo;Pini, 2010.
NETO, A. P. M; Planejamento e controle de obras técnicas. INSTITUTO FEDERAL DE EDUCAÇÃO,CIÊNCIA E TECNOLOGIA DE SERGIPE, Monografia(Graduação em Engenharia Civil), Aracaju, 2017.
OLIVEIRA, A. N. S. et al. Tecnologias Integradas aos Planos de Gestão em Projetos na Construção Civil –Um Estudo de Caso. Revista Científica Vozes dos Vales, Minas Gerais, n. 09, p 1 –35, mai.2016.
RIBEIRO, Renato Vieira. Estratégia empresarial e de recursos humanos. IESDE BRASIL SA, 2016.
TEIXEIRA. R.T; Análise de risco na metodologia PERT/CPM aplicado na construção civil, Doc-PublicoBIBLIOSREPOSITÓRIO INSTITUCIONAL, Abr/2016.
VERGARA. W. R. H; TEIXEIRA. R.T; YAMANARI. J.S, Análise de risco em projetos de engenharia: uso de PERT/COM com simulação. Exacta, v.15, n.1. p.75-88. São Paulo. 2017.Disponível em: DOI: https://doi.org/10.5585/exactaep.v15n1.6779Acesso em 26 jul. 2020.
VILCAPOMA, A. A. I; MOURA, L. M; SAMPAIO, L. M. D, USO DA SIMULAÇÃO DE MONTE CARLO EM PROJETOS DE CONSTRUÇÃO DE RODOVIAS NO NORTE FLUMINENSE, Anaisdo XVII Simpósio de Pesquisa Operacional e Logística da Marinha-SPOLM 2014, v.1 n.1, São Paulo: Ago/2014.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2021 Cleber Nelson da Rocha das Neves, Marcos dos Santos, Carlos Francisco Simões Gomes, Renato Santiago Quintal
This work is licensed under a Creative Commons Attribution 4.0 International License.
The Diversitas Journal expresses that the articles are the sole responsibility of the Authors, who are familiar with Brazilian and international legislation.
Articles are peer-reviewed and care should be taken to warn of the possible incidence of plagiarism. However, plagiarism is an indisputable action by the authors.
The violation of copyright is a crime, provided for in article 184 of the Brazilian Penal Code: “Art. 184 Violating copyright and related rights: Penalty - detention, from 3 (three) months to 1 (one) year, or fine. § 1 If the violation consists of total or partial reproduction, for the purpose of direct or indirect profit, by any means or process, of intellectual work, interpretation, performance or phonogram, without the express authorization of the author, the performer, the producer , as the case may be, or whoever represents them: Penalty - imprisonment, from 2 (two) to 4 (four) years, and a fine. ”